Along with the continuous development of industry worldwide, human life is facing the problems of energy crisis and environmental pollution. With the scientific knowledge and experiences accumulated over decades and many industrial energy projects, along with social responsibility, IBS focuses our resources on the development of the renewable energy industry, cooperating with the global partners in the world, for meeting the world’s growing energy needs requires tapping into new found energy resources that can not be fully developed without significant and sustainable investment.Change is needed, now more than ever.

1

“IBS ENERGY PROJECT ‘S EPC CAPABILITIES”

IBS has been the first and only Vietnamese EPC Contractor capable of deploying full scope of EPC from Engineering, Procurement, Installation, Commissioning of the largest scale wind power plant in Southeast Asia at the awarded time.

2

OUR BRIEF STORY ABOUT TAY NGUYEN WIND FARM

“WE ARE BEST EQUIPPED FOR JOB”

     IBS is presently contracted to major energy companies, carrying out nationwide power plants varying in scale and energy types. In addition to expertise know – how and a strong source of high profile manpower, the company business is boosted by a wide range of machinery and equipment, making us the best equipped within a peers.

 

      Covering from a fleet of oversize and overweight transport vehicles to sky-high crawler crane, IBS’s equipment allow he team to handle mega-size projects spreading from offshore to remote highlands. In addition, possessing a unique fleet of mobile cranes and experienced engineers enable IBS to implement any sky-high project confidently and safely with IBS’s extraordinary capabilities.

3

 

“CHALLENGE THE NORM”

      The project was difficult to execute not only because of its mega-scale and tight timeline but also because the facility is located on an extremely difficult to maneuver site. Sited 700 – 900 meter-high on Tay Nguyen highlands, having only two routes for transport, 570 km from SITV Phu My International  Port and 321 km from Cam Ranh Port with a tremendous bill of materials, equipment & supplies to manage.

      The logistics required capacity in streamlining procurement to keep up withthe progress of stakeholders; capacity in supply via planning, optimizing routes; employing heavy tractors and lifting equipment; while building and improving new routes due to remote areas and lack of transport infrastructure. Because of the humid tropical plateau climate with a rainy season from April to September, the weather and climate also affected site planning and transportation. Technical elements of concrete foundations must be ensured while weather conditions hinder the construction, filling and deploying on  schedule.

4

 

““OUR INCREDIBLE VENTURE AND MORE OVER””

Our Executive team has demonstrated an unwavering commitment to safety and delivery excellence on this project by leveraging global PMC expertise combined with cutting-edge engineering capabilities, topped with local knowledge in delivering TayNguyen Wind Farm, South East Asia’s largest wind power project. Aiming to complete constructing  the first of a three-phase wind project by June 2020, we hailed the milestone in an “incredible adventure,” achieved through months of close collaboration between our client, partners and subcontractors,coupled with the extraordinary commitment of the teams, more than 300 people at peak of activities, to overcome complicated logistics and extreme climatic condition

BY GE – TAY NGUYEN WIND FARM INVESTOR

“IBS is among the leading EPC contractors in Vietnam that has put great focus on investing in a wide range of top-notch equipment both importing some top of the line branded tools and machineries that are hard to find in this market. They are also the few that have acquired international licenses and certificates that allow their local engineers to practice maintenance, overhaul, and repair of WTG”

 

energy
projects

TAY NGUYEN WIND FARM

The forth and largest Wind Power Project in Viet Nam and Southest Asia at the awarded time.

Tay Nguyen Wind Farm

Project: Tay Nguyen Wind Farm

Location: Ea'Hleo, Dak Lak, Viet Nam

Investor: HBRE Wind Power Solution., Jsc

Total investment: 560 million USD

Total capacity: 440 MW

Scope of works: EPC contractor

Completion time: 2020

LIEN LAP WIND FARM

LIEN LAP WIND FARM

Project: Lien Lap Wind Farm

Location: Tan Lien and Tan Lap, Huong Hoa, Quang Tri, Viet Nam

Investor: Power Construction No.1, Jsc

Total investment: 1.973 billion VND

Total capacity: 48 MW

Scope of works: Vestas contractor

Completion time: 2021

B&T WIND FARM

B&T WIND FARM

Project: B&T Wind Farm

Location: Gia Linh, Quang Ninh, Quang Binh, Viet Nam

Investor: BT1 Windfarm., Jsc

Total investment: 3.600 billion VND

Total capacity: 109,2 MW

Scope of works: Vestas contractor

Completion time: 2021

    EXPLORE THE FEATURES

    Get in touch with us today

    24th Floor, Tower B, 173 Xuan  Thuy Building, Dich Vong Hau Ward, Cau Giay Dist, Ha Noi

    Tel: (+842) 439 723 435

    Fax: (+842) 439 723 433

    Email: info@ibs.com.vn